The Thames Water Utilities Limited (Thames Tideway Tunnel Order 2014) came into effect on the 24 September 2014. The Local Planning Authority is required to determine a number of planning applications submitted by Thames Water Utilities Limited in relation to the Order.

These applications are for discharging the requirements of the Order and are not for the principle of development which has already been approved after public examination. There is no requirement to consult when determining the applications, except with legal consultees in circumstances as stated within the Order. However, the Planning Officer will decide as to whether public consultation is considered necessary within the 8 week determination period, over and above the consultation requirements set out in the Order.

View and comment on planning applications

Formal applications

To view and comment on the Thames Tideway Tunnel applications please go to the Planning search and within the Search Criteria: Application Type choose Thames Tideway Tunnel and click the 'Search' button. 

Any comments need to be submitted within three weeks of the date of registering the application.

Draft applications

Before the submission of the formal application the Council has the opportunity to provide comments to the Thames Tideway Tunnel Ltd project team on the content of the draft applications.    

Email comments on the content of the draft applications to thamestunnel@wandsworth.gov.uk with the subject 'draft application'.

Any comments need to be submitted within three weeks of the date of the application which can be found on the covering letter. Please see the table below for the details of draft applications received. 

There will be the chance to comment on the formal application at a later date, please see the above section on formal applications for details of how to do so.

Submitted draft applications 

Thames Tideway Tunnel Limited have submitted the following draft applications to the Council:

Application number Description Comment deadline 

C450/DRMST/PLN/WAN/003

(Appendices for the application are available upon request)

This draft application to discharge Requirement DRMST3 relates to the replacement of the river wall and demolition of warehouse, gatehouse and existing substation. 17 April 2015

C478/MLTST/PLN/WAN/002

The application will be for the approval of trigger values for noise insulation and temporary rehousing in relation to noise and vibration impacts on houseboats in the vicinity of worksites at Putney Embankment Foreshore, Kirtling Street and Heathwall Pumping Station, as part of the Thames Tideway Tunnel project. 9 February 2015

C450/DRMST/PLN/WAN/005

Draft Application for the approval of a Work Site Construction Logistics Plan for relevant early works at Dormay Street, comprising of river wall replacement and associated demolition works.

21 October 2015

 

C410/KRTST/PLN/WAN/002

 

Draft application for the partial discharge of a Schedule 3 Requirement – PW17 Noise and Vibration Trigger Values. The trigger values are for noise insulation and temporary rehousing in relation to noise and vibration impacts on houseboats, for the following sites: Putney Embankment Foreshore, Kirtling Street and Heathwall Pumping Station, and for night-time and marine activities only.

19 November 2015
C437/KRTST/PLN/WAN/001 Draft application for the partial discharge of a Schedule 3 Requirement – PW6 (CoCP Part A) through the submission of a Worksite Specific Construction Logistics Plan in relation to the electrical sub-station and power supply preparatory works at Kirtling Street. 3 December 2015
C437/NELMS/PLN/WAN/001

Draft Application for the partial discharge of Requirement – PW6 (CoCP Part A) of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2104 for the approval of a Worksite Specific Construction Logistics Plan relating to the works at Nine Elms Lane for the replacement of a section of the existing water trunk main in the highway outside of the existing Thames Water Heathwall Pumping Station.

8 February 2016
C437/NELMS/PLN/WAN/003

Draft Application to partially discharge Schedule 3 Requirement – PW6 Community Liaison Plan (CoCP Part A, Section 3.1.2)

24 February 2016
C405/KNGGP/PLNIWAN/003

Draft Application to discharge Schedule 3 Requirement - PW9 (Built Heritage Recording) in relation to King George's Park.

14 June 2016

C405/PUTEF/PLN/WAN/012

Construction Logistics Plan

Construction Logistics Plan Application Form

Construction Logistics Plan Cover Letter

Construction Logistics Plan - Sch 17 Notice

Draft application for approval of a  Construction Logistics Plan as required by Schedule 17, in compliance with and partial discharge of Schedule 3 Requirement PW6 and PUTEF1 (Putney Embankment Foreshore) in regards to CoCP Part A. 20 September 2016

C405/PUTEF/PLN/WAN/033

3310-BMBJV-PUTEF-620-ZZ-DR

General Arrangement

Elevations

Typical Cross Section

Prep Works Plan

Prep Works Section

Block Section 1 of 2

Block Section 2 of 2

Precast Concrete Blocks 1 of 5

Proposed Materials

Temp Slipway - Cover Letter

Temp Slipway - Sch 17 Notice

Temp Slipway Supporting Statement

Temp Slipway - Application Form

Discharge of Schedule 3 requirement  PUTEF08 (Temporary Slipway Construction) of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 at Putney Embankment Foreshore 26 September 2016

Additional information

A range of additional information has been made available by Thames Tideway Tunnel Limited which can be viewed on their website. It has been provided for information purposes and does not require further approval from Council.